Eave Vent 4" Duct Connection
Face plate:
Installation steps: 1. From the outside, cut a 5 1/4" x 5 1/4" hole in the eave close to the outside edge. 2. Reach into the cutout and check for suficient space between the roof decking and the top plate of framing for 4 ducting. 3. Notch top plate to provide clearance if necessary. 4. Attach ducting to eave vent. 5. Insert eave vent into cutout from outside. (Check your building code for the proper type of vent to use.) 6. Make sure backdraft damper swings freely. 7. With (4) screws (not included) fasten the eave vent to the eave. 8. From the inside, add section of ducting to complete the run to the dryer.
Formed aluminum construction for a 90 degree exit through a soffit. Requires a 5 1/4" x 5 1/4" hole to be cut into the soffit and the cap angled up and screwed into place.